Gatwick Airport is the UK’s second largest airport. It serves more than 228 destinations in 74 countries for 46m passengers a year on short and long-haul point-to-point services. It is also a major economic driver and generates around 85,000 jobs nationally, with 24,000 of these located on the airport. The airport is south of Central London with excellent public transport links, including the Gatwick Express, and is part of the Oyster contactless payment network. Gatwick Airport is owned by a group of international investment funds, of which Global Infrastructure Partners is the largest shareholder.
Gatwick is investing in the transformation of the airport and the reconfiguration of Pier 5 was an essential development for the North Terminal, allowing an enhanced passenger experience. SES Engineering Services (SES) was appointed to work with Gatwick in a challenging 24/7 operational airfield environment.
SES made extensive use of its industry-leading prefabrication factory, Prism. The specialist team delivered a series of innovative offsite solutions including 78 modularised chilled beams with support frame cable containment, ladder, pipework isolation and control valves all pre-installed at the Prism factory. The whole unit was then fitted with wheels and shrink-wrapped ready for transportation to site.
This process significantly reduced the number of hours’ onsite, whilst overcoming the many logistical programme and delivery challenges that an airport of this scale faces.
Gatwick Airport Pier 5 officially opened in February 2016.
from airside operations
fixed offsite
chilled beams installed
Other Case Studies

University of Leeds – School of Chemical and Process Engineering
The University of Leeds embarked on an ambitious £520m five year programme of works to transform its entire campus to support its vision for increasing knowledge and opportunity with a focus on world-leading research, collaborative industry partnerships and further enhancing the student experience for 1,000+ students who come from 70+ countries to study in the building.

Royal London Hospital
In less than five weeks, SES Engineering Services (SES) and Wates Construction delivered a full fit-out of floors 14 and 15 at Royal London Hospital, to create additional capacity for more than 170 intensive care beds to support the COVID-19 pandemic.

Sandwell Aquatics Centre
The Sandwell Aquatics Centre was initially constructed to host one of the most significant international sporting events of 2022