SES Engineering Services (SES) delivered a key element of Manchester City Council’s £185m transformation and redevelopment programme at One St Peter’s Square for Elisabeth House General Partner Limited (a joint venture partnership between Argent and the Greater Manchester Property Venture Fund) which provides all the essential elements of an exceptional world-class building.
One St Peter’s Square offers 268,000 sq ft of BREEAM ‘Excellent’ Grade ‘A’ office space in the heart of central Manchester’s business district. The new building, along with Manchester City Council’s transformation and redevelopment of the Square, Library Walk, Central Library and The Town Hall extension, demonstrates the scale of the city’s ambition to transform its civic heart.
Against a backdrop of stiff competition, SES won a hard-fought bidding process in May 2012 to deliver a modular solution for the client. SES completed the design and installation of all M&E works within the new building. Its tireless approach and use of its offsite manufacturing facility Prism to deliver a series of innovative offsite solutions significantly reduced costs, labour hours spent on site and delivered a safer on-site working environment which resulted in direct work savings of 13,000 labour hours.
SES also used pioneering BIM2MOSAIC technology to maximise the benefits of the off-site project elements which were to be delivered. Smart thinking was apparent on this project; we introduced thin wall stainless steel in place of traditional carbon steel on all pipework with a diameter above 100mm. This innovation made the installation significantly lighter and cleaner, and reduced the amount of water treatment required.
labour hours saved
installed in 3 weekends
of Grade ‘A’ office space
‘Excellent’
Other Case Studies

The Defence and National Rehabilitation Centre (DNRC)
Handed over by Prince William, the Duke of Cambridge and Prime Minister, Theresa May in June 2018, the DNRC will be operated by the Ministry of Defence when it opens later this year.

Newcastle District Energy Centre
Supporting the city of Newcastle Upon Tyne in its endeavours to go carbon neutral by 2030, SES Engineering Services (SES) was directly appointed by Engie as main contractor to design and install complex MEP solutions on Newcastle District Energy Centre.

SeAH Wind Monopile Factory
Due to complete in 2025, SeAH Wind’s giant 40-metre-tall, 800m long monopile factory will be the largest of its kind in the world.